• HOME

    • PROJECT HIGHLIGHTS
    • CONTACT
  • COMPANY

    • ABOUT
    • TEAM
    • CAREERS
  • SERVICES

    • STORMWATER
    • WATER & WASTEWATER
    • LANDSCAPE ARCHITECTURE & URBAN DESIGN
    • HIGHER EDUCATION
    • CIVIL
    • MECHANICAL
    • TRANSPORTATION
    • ENERGY & NATURAL GAS SOLUTIONS
    • FUNDING ASSISTANCE
  • NEWS

  • More

    Use tab to navigate through the menu items.
    Featured Posts
    UK FEMA ACEC Award

    UK FEMA ACEC Award

    Recent Posts
    When Disaster Strikes: Bids Are Significantly Under Budget

    When Disaster Strikes: Bids Are Significantly Under Budget

    When Disaster Strikes: Bids Exceed Budget or Available Funds

    When Disaster Strikes: Bids Exceed Budget or Available Funds

    When Disaster Strikes: Series Introduction

    When Disaster Strikes: Series Introduction

    We're Growing!

    We're Growing!

    Back to the Future Planning

    Back to the Future Planning

    Search By Tags
    • Awards
    • Bidding
    • Bike
    • Celebration
    • Conservation
    • COVID-19
    • Dedication
    • Environment Protection
    • Expansion
    • FEMA
    • Flood Migitation
    • Funding
    • Ground Breaking
    • Historic Preservation
    • Infrastructure
    • LA & Planning
    • Natural Gas
    • Natural Resources
    • Operations
    • Partners
    • Pedestrian
    • Personnel
    • Planning
    • Presentation
    • Pretreatment
    • Publication
    • Raw Water Intake
    • Ribbon Cutting
    • Sanitary Sewer
    • Social Distancing
    • Stormwater
    • Transportation
    • Upgrade
    • Upgrades
    • Volunteer
    • Wastewater Treatment
    • Water
    • Water Line
    • Water System
    • Water Treatment Plant
    • When Disaster Strikes
    • August 2021 (1) 1 post
    • April 2021 (1) 1 post
    • March 2021 (1) 1 post
    • August 2020 (1) 1 post
    • June 2020 (1) 1 post
    • May 2020 (2) 2 posts
    • March 2020 (1) 1 post
    • January 2018 (1) 1 post
    • April 2017 (1) 1 post
    • March 2017 (2) 2 posts
    • October 2016 (1) 1 post
    • August 2016 (1) 1 post

    Greensburg New Water Treatment Plant

    Bell Engineering worked with the City of Greensburg to develop a project to replace the existing 1.4 mgd conventional water treatment plant (WTP) with a new 2 mgd conventional WTP. The existing plant had reached the end of its useful life and renovation and expansion were not economically feasible. Also included is the replacement of the existing raw water intake and pumping facility and construction of new high service transmission piping to connect the new water treatment p

    Planroom Access

    Transparency in Coverage Rule