• HOME

    • PROJECT HIGHLIGHTS
    • CONTACT
  • COMPANY

    • ABOUT
    • TEAM
    • CAREERS
  • SERVICES

    • STORMWATER
    • WATER & WASTEWATER
    • LANDSCAPE ARCHITECTURE & URBAN DESIGN
    • HIGHER EDUCATION
    • CIVIL
    • MECHANICAL
    • TRANSPORTATION
    • ENERGY & NATURAL GAS SOLUTIONS
    • FUNDING ASSISTANCE
  • NEWS

  • More

    Use tab to navigate through the menu items.
    Featured Posts
    UK FEMA ACEC Award

    UK FEMA ACEC Award

    Recent Posts
    When Disaster Strikes: Bids Are Significantly Under Budget

    When Disaster Strikes: Bids Are Significantly Under Budget

    When Disaster Strikes: Bids Exceed Budget or Available Funds

    When Disaster Strikes: Bids Exceed Budget or Available Funds

    When Disaster Strikes: Series Introduction

    When Disaster Strikes: Series Introduction

    We're Growing!

    We're Growing!

    Back to the Future Planning

    Back to the Future Planning

    Search By Tags
    • Awards
    • Bidding
    • Bike
    • Celebration
    • Conservation
    • COVID-19
    • Dedication
    • Environment Protection
    • Expansion
    • FEMA
    • Flood Migitation
    • Funding
    • Ground Breaking
    • Historic Preservation
    • Infrastructure
    • LA & Planning
    • Natural Gas
    • Natural Resources
    • Operations
    • Partners
    • Pedestrian
    • Personnel
    • Planning
    • Presentation
    • Pretreatment
    • Publication
    • Raw Water Intake
    • Ribbon Cutting
    • Sanitary Sewer
    • Social Distancing
    • Stormwater
    • Transportation
    • Upgrade
    • Upgrades
    • Volunteer
    • Wastewater Treatment
    • Water
    • Water Line
    • Water System
    • Water Treatment Plant
    • When Disaster Strikes
    • August 2021 (1) 1 post
    • April 2021 (1) 1 post
    • March 2021 (1) 1 post
    • August 2020 (1) 1 post
    • June 2020 (1) 1 post
    • May 2020 (2) 2 posts
    • March 2020 (1) 1 post
    • January 2018 (1) 1 post
    • April 2017 (1) 1 post
    • March 2017 (2) 2 posts
    • October 2016 (1) 1 post
    • August 2016 (1) 1 post
    Upgraded Water Treatment Plant in Madisonville

    Upgraded Water Treatment Plant in Madisonville

    The upgraded water treatment plant in Madisonville, Kentucky, recently began operation. Bell’s design for the city included upgrading the existing 8 mgd conventional plant to a 10.5 mgd capacity membrane filter plant, including a new filter and operation building, replacement of the existing SCADA system and new chemical feed systems. Improvements to both the river and reservoir raw water pumping stations and upgrading the reservoir intake were also a part of the project.

    Planroom Access

    Transparency in Coverage Rule